Pre-Solve Checklist

Go through this checklist before clicking Start Calculation.


If you only have 2 minutes

Run through this checklist before clicking Start Calculation. It takes 3 minutes and prevents the most common setup mistakes.

Model

  • [ ] Geometry simplified (small features removed)?
  • [ ] Scale correct (mm)?
  • [ ] All bodies present?

Mesh

  • [ ] Mesh generated and visually checked?
  • [ ] Mesh quality acceptable (skewness, aspect ratio)?
  • [ ] Local refinement at critical locations?

Boundary conditions & loads

  • [ ] Boundary conditions physically meaningful?
  • [ ] No rigid body movement possible?
  • [ ] Loads correct (direction, magnitude, unit)?
  • [ ] Unit system consistent throughout?

Contact

  • [ ] Contact pairs defined for all touching parts?
  • [ ] No initial penetration?
  • [ ] Contact type appropriate (bonded vs frictional)?

After checking all boxes

If everything is green, submit the job. If you're unsure about any item, resolve it before running — a failed or implausible result costs more time than a thorough pre-check.